I. Static Calibration Preparation
1. Tool Preparation
Laser alignment instrument (accuracy ±0.001mm) or dial indicator (accuracy 0.01mm)
Torque wrench (accuracy ±5%) for tightening the reducer mounting bolts
2. Datum Setting
Use the main roller as the reference axis, and clean the end faces of the reducer output shaft and the roller coupling.
II. Core Calibration Steps
1. Coaxiality Calibration
Measure the radial/angular deviation between the reducer output shaft and the roller, requiring ≤0.02mm (≤0.01mm for high-speed machines)
Adjust by adding or removing shims, avoiding forcibly bending the shaft system.
2. Phase Alignment
Mark the coupling reference line; the offset during jogging test should be ≤0.03mm (corresponding to the registration accuracy)
Perform absolute encoder homing operation using dedicated driver software (such as Siemens Startdrive).
3. Servo Parameter Debugging
Adjust the PI controller parameters (integral time constant) to eliminate steady-state error.
Record the position fluctuation curve using the Trace function to compensate for installation errors.
III. Dynamic Verification
Monitor the registration error during load testing; if the error consistently exceeds the tolerance, recalibrate the feedback loop.
For multi-color printing machines, ensure that the phases of each color unit are synchronized to avoid cumulative errors.