I. Basic Maintenance Cycle
1. Daily Maintenance
Clean the machine, check the air supply pressure (≥0.45 MPa) and the condition of the scraper (a 0.1 mm gap requires replacement).
Focus on checking the parallelism of the stencil holder and the conveyor rail (≤0.05 mm).
2. Weekly Maintenance
Deeply clean the pressure supply system (pay attention to the airflow direction when removing the filter).
Lubricate the stencil rail and ball screw (grease amount = thread clearance x 1.5).
3. Monthly Maintenance
Replace the lubricant (new machine within two weeks of first use). (A complete oil change is required after each overprint.)
Inspect gears, bearings, and other core components for wear.
II. Special Scenarios
High-load operation (over 8 hours per day): Maintenance intervals must be shortened by 30%.
Multi-color printing presses: Register accuracy must be calibrated after every 5,000 overprints.
III. Long-term Maintenance Recommendations
Annual Overhaul: Completely inspect the electrical system and replace servo motor bearings (recommended every 2 years).
Environmental Adaptation: Dust filters in dusty workspaces must be replaced monthly (200-500 yuan/per operation).

